Project Summary |
|
Jump to: |
|
|
|
|
|
|
|
|
|
Electrical |
Tiling |
Carpentry |
Plumbing |
Drywall |
Painting |
|
Demo |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
bathroom |
|
|
|
|
|
|
|
|
bathtub |
|
|
|
|
|
|
|
|
|
sink |
|
|
|
|
|
|
|
|
|
toilet |
|
|
|
|
|
|
|
|
|
floor tiles |
|
|
|
|
|
|
|
|
|
shower tiles |
|
|
|
|
|
|
|
|
counter top |
|
|
|
|
|
|
|
|
all lights |
|
|
|
|
|
|
|
|
|
fan |
|
|
|
|
|
|
|
|
|
remove mirror |
|
|
|
|
|
remove faucets (preserve) |
|
|
|
|
|
|
|
remove drywall |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
kitchen |
|
|
|
|
|
|
|
|
|
remove dishwasher |
|
|
|
|
|
|
|
|
all lights |
|
|
|
|
|
|
|
|
|
counter top |
|
|
|
|
|
|
|
|
remove kitchen sink |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Main Area |
|
|
|
|
|
|
|
|
all lights |
|
|
|
|
|
|
|
|
|
ceiling fan |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Loft |
|
|
|
|
|
|
|
|
|
demo old trim on floor at edge of loft |
|
|
|
|
|
|
demo old baseboards in loft |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Entire Loft |
|
|
|
|
|
|
|
|
doors and trim |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additional Work |
|
|
|
|
|
|
|
|
entire bathroom |
|
|
|
|
|
|
|
|
upstairs flooring |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Electrical |
|
|
|
|
|
|
|
|
|
5 pot lights |
|
|
|
|
|
|
|
|
5 pot lights |
|
|
|
|
|
|
|
|
1 10 volt outlet for stove |
|
|
|
|
|
|
|
ceiling fan |
|
|
|
|
|
|
|
|
|
3 baseboard heaters (in same location as previous) |
|
|
|
|
|
(2) 3 light tracks or (1) 6 light tracks (depends on what's possible) |
|
|
|
|
new bathroom fan |
|
|
|
|
|
|
|
|
under-floor heating in bath |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additional Work |
|
|
|
|
|
|
|
|
had to return as the lights wouldn't work and new lights had to be
aquired |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tiling |
|
|
|
|
|
|
|
|
|
under floor heating |
|
|
|
|
|
|
|
|
extend from main floor into bathroom |
|
|
|
|
|
|
on bathroom and kitchen counters and bathroom shelf |
|
|
|
|
|
white tiles with accents from counter and shelf in bath/shower area |
|
|
|
back splash |
|
|
|
|
|
|
|
|
trim along wall (same tiles as floor) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additional Work |
|
|
|
|
|
|
|
|
install membrane |
|
|
|
|
|
|
|
|
install granite tiles in kitchen, stencil and cut out hole for sink |
|
|
|
|
cut granite tiles down to 4x4 from 12x12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Carpentry |
|
|
|
|
|
|
|
|
build and install kitchen counter |
|
|
|
|
|
|
|
build install bathroom counter and shelf under counter |
|
|
|
|
|
measure, cut and install all baseboards |
|
|
|
|
|
|
install all doors and trim including edge of loft trim |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additional Work |
|
|
|
|
|
|
|
|
install new flooring ustairs (loft) |
|
|
|
|
|
|
|
Charge for change |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plumbing |
|
|
|
|
|
|
|
|
install all new taps and valves |
|
|
|
|
|
|
|
install sink in bathroom and in kitchen |
|
|
|
|
|
|
install toilet |
|
|
|
|
|
|
|
|
standing shower (two glass walls and floor (fiberglass?) |
|
|
|
|
install dishwasher |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additional Work |
|
|
|
|
|
|
|
|
re-install garbarator |
|
|
|
|
|
|
|
|
install new kitchen taps |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Drywall |
|
|
|
|
|
|
|
|
|
hang concrete board in bathroom |
|
|
|
|
|
|
hang Aqua Board in bathroom |
|
|
|
|
|
|
|
repair drywall where gasfitter cut into wall |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additional Work |
|
|
|
|
|
|
|
|
hang all new drywall in bathroom including double on ceiling (Aqua
board and concrete board) |
|
mud, tape, sand repeat 2-3 times |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Painting - includes paint |
|
|
|
|
|
|
|
Paint ceiling -a custom feature surface: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
apply basecoat to ceiling |
|
|
|
|
|
|
|
apply second coat -grey/blue color |
|
|
|
|
|
|
apply plastic to surface |
|
|
|
|
|
|
|
during drying stage to create a textured look |
|
|
|
|
|
finish off effect by hand with brushes and spunges |
|
|
|
|
Paint remaining apartment: |
|
|
|
|
|
|
|
|
Prep all wall surfaces for painting this includes |
|
|
|
|
|
mud,tape,sand and repeat two to three times |
|
|
|
|
|
Calk and fill and sand all baseboards |
|
|
|
|
|
|
paint all walls and all baseboards |
|
|
|
|
|
Additional Work |
|
|
|
|
|
|
|
|
paint kitchen under wall cabinetry and front of counter |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Manager: Amanda B 604-569-1MAN or 778-240-8021